Overview
Thermal plants comprising boilers, steam turbines and gas turbines experience fatigue, thermal cycling and high operational stress. Failure events can have immediate significant grid and safety implications. ProAIM helps operators through RAM analysis, maintenance policy optimisation and reliability frameworks that reduce forced outages and improve availability. Results include lower lifecycle cost and stronger contribution to grid reliability.
